Out of stock
Actually not available - delivery delay on request
Minimum purchase quantity
The minimum purchase quantity is not reached

01SC080 - 8 cm blade - G10 handle

Ref. 01SC080
Boker
A.38
Boker Magnum Long Lead folding knife

see also : Boker Magnum Long Lead folding knife Boker Magnum Long Lead folding knife Boker Magnum Long Lead folding knife Boker Magnum Long Lead folding knife

non-contractual photo

New 29.77 Including tax

In stock

quantity

Back in stock notification
Receive an alert by email when your choice is in stock
Your e-mail*:

Send this page to a friend

Product Details

EDC Knife Boker Magnum Long Lead

Classic folding knife for everyday use with a simple curved design.
White, satin-finished Drop Point blade made of 8Cr13MoV steel with smooth cutting edge, manual opening with notch on the blade.
Black G10 handle plates
Safety opening: forced notch
Carrying: Clip
Very good EDC knife for all types of outdoor work


Dimensions: 
Total length: 18,4 cm.   
Blade length: 8 cm.
Blade thickness: 2.7 mm
Weight: 78 g

BOKER Magnum folding knives, hiking knives

interligne
interligne interligne interligne interligne interligne interligne interligne interligne interligne interligne interligne
Boker Magnum Classic automatic knife Boker Magnum Classic automatic knife 01RY911 - Blade 8,4 cm - Rosewood handle Brand Boker 37.25 Including tax
Actually not available - delivery delay on request  
interligne interligne interligne interligne interligne
Boker Magnum Miyu folding knife Boker Magnum Miyu folding knife 01SC060 - 10,2cm blade - G10 handle Brand Boker 36.25 Including tax
Actually not available - delivery delay on request  
interligne interligne interligne interligne interligne interligne interligne interligne interligne interligne interligne interligne interligne
090036 Black leather case Boker Magnum maxi knife 12 cm 090036 Black leather case Boker Magnum maxi knife 12 cm Stitched leather Brand Boker 25.55 Including tax
Actually not available - delivery delay on request  
interligne interligne interligne interligne interligne interligne interligne interligne interligne interligne interligne interligne interligne interligne interligne interligne interligne interligne interligne interligne interligne
interligne